C
Caliber / Source: real 80 West Broadway document set
C

Caliber

Precision facade takeoffs

Facades · Curtain wall · Masonry · Glazing

Active Takeoffs

Multi-project estimating queue

1
Active Takeoffs
1
Needs Review
1
Verified
1
Bid-Ready
Project
Architect
GC / Owner
Sheets
Units
Status

Click a project to open. Only projects with completed intake are available.

Document Intake & Triage

· Change orders after this baseline flag as added cost

Whole RFP set ingested — facade-relevant documents surfaced

Showing of
Document Discipline Relevance Confidence
Trade scope: Facade / building envelope
files ingested ( unique) → facade-relevant items ( envelope sheets + specs)

Schedule & Scope Extraction

Finish schedule + scope of work, source-linked — no manual transcription

Exterior Finish Schedule
A-620
Scope of Work
Trade categories (Exhibit B CB-1..CB-6)
Basis of design
Scope sections:
| Sheet: | Scale:
Elevations
elevation
Conditions
Running totals (building-wide)
Window/door units
Type A (W-B) openings
Terracotta profiles
Calibrate Scale

Scale read from title block. Confirm to begin automatic region mapping.

1/8″ = 1′-0″ (Sheet A-201)
Inspect / Reassign opening
Detected type:
Reassign material:
Reconciling 80 West Broadway takeoff against source documents
Quantity Tie-outs
Click a card to view the cross-source check
Drawing-Derived Quantities
Source: A-201/A-202 detection × A-610 schedule · estimates labeled
Category
Qty
Unit
Status
Takeoff Verified — 80 West Broadway
Quantities derived from A-201/A-202 detection × A-610 schedule · Exhibit B scope confirmed. Ready for estimator pricing.
Category
Quantity
Unit
Status
Sources
This takeoff contains quantities only. The estimator applies material costs, labor rates, and overhead to produce the bid. Caliber stops where human judgment starts.
Source
Reference
Sheet
source sheet
Extracted directly from the drawing set — no manual transcription.